Call Us : 91-22-28596350 | 91-22-28592325

Clientele

Multiple orders from same client

 

S.R.No.   Client Name Work Details
Service Provided
 
1.  ♦  M/s Lubrizol India Pvt. Ltd. Navi Mumbai
Stage wise and Final inspection  of all plant equipment's including SS Reactors, Heat Exchangers, Distillation Columns, Centrifuges, Dryers, Filters, Glass Lined Reactors and bought out items like Valves, Pipes, pipe fittings etc.
 
2. M/s Eco Fuel Technologists Pvt. Ltd. Various installation all over India
Approval of Civil Design and Drawing, Stage Inspection of Civil work and Certification as per Rule-33.
 
3.  ♦ M/s Petroman Petroleum consultant LLC ----
Expediting and  Inspection of various sizes (6" to 18") Wafer type Butterfly valves for Cryogenic service at  ADVANCE Valves - Noida
 
4.  ♦ M/s Hikal Ltd. Banglore, Panoli, Mahad, Taloja
Stage wise and Final inspection  of all plant equipments including Reactors, Heat Exchangers, Distillation Columns, Centrifuges, Dryers, Filters, Glass Lined Reactors , ANFD and bought out items like Valves, Pipes, pipe fittings.
 
5.  ♦ M/s Thermax Ltd. Various power plants projects in India
Inspection  of fabricated equipments and  bought out items like  Valves, Pipes, pipe fittings, plates, Structural  etc.
 
6. International Steel Services Inc. Export to USA
Inspection and Expediting  of various equipments & components consisting of FRP equipments FRP pipes ,Pipe fittings, Pumps, Valves, Instruments, Electrical equipments etc.
 
7. M/s Pidilite Industries Ltd. Mumbai, Vapi, Mahad, Kalamb etc.
Stage wise Inspection &  Expediting of fabricated equipments like  Centrifuges, Dryers, Filters, Glass Lined Reactors, Hastelloy reactors etc. and bought out items like  Valves, Pipes, pipe fittings etc.
 
8. M/s Dabur Pharma Limited Kalyani
Stage wise and Final Inspection of fabricated equipments like Graphite Heat Exchanger , Autoclaves , Reactors, Heat Exchangers, Distillation Columns etc.
 
9.   M/s Current Krafters ---
Stage Inspection of Storage Tanks as per API-650
 
10.   M/s Vamshi Exports  Ltd. Delhi
Approval of fabrication & drawings and stage inspection of Cladded Reactors.
 
11. M/s Krison Engg. Works Various installations in India
Civil & mechanical design approval and stage wise inspection of pressure vessel & civil works and Certification as per SMPV (U) rules.
 
12.   M/s Pioneer Fabricators Various installations in India
Inspection and Certification of 3 Nos. 80 M3 capacity Air / Nitrogen Receiver Tanks as per CCOE Rules.
 
13. M/s United Phosphorus Ltd. Jhagadia, Ankleshwar
Stage wise and Final inspection  of all plant equipments including SS Reactors, Heat Exchangers, Distillation Columns, Centrifuges, Dryers, Filters, Glass Lined Reactors , ANFD etc.
 
14. M/s Baerlocher India Additives  Ltd. Germany , Dewas ( M.P.)
Stage wise inspection and final inspection of Reactors and other process equipments, Material handling systems with conveyors, Buckets elevators, rotary valves, blowers etc. Electrical panels, VFD, Instruments, Site inspection during erection, Piping etc.
 
15. M/s Arch Pharmalabs Ltd. Gurgaon, Sibra (Hyderabad)
Stage wise Inspection and Expediting of fabricated equipments like SS Reactors, Heat Exchangers, Distillation Columns, Centrifuges, Dryers, Filters, Glass Lined Reactors, Hestalloy reactors etc.
 
16. M/s Sunshield Chemicals Ltd. Pali (Maharashtra)
Stage wise and Final inspection  of all plant equipments including Reactors, Heat Exchangers, Distillation Columns, Centrifuges, Dryers, Filters, Glass Lined Reactors ,ANFD etc.
 
17. M/s Psc Europe  
Stage wise inspection , Expediting &  Final Inspection  of Compresser  at Dressar Rand , Drill pipes , Valves.
 
18. M/s Lupin Ltd. Mandideep, Tarapur, Ankleshwar, Indore, Auragabad
Stage wise inspection or Final Inspection  of  Reactors, Pressure Vessels, Heat Exchanges, Columns and final inspection of various bought out items like Glass lined Reactors,  Pumps, Valves, Pipes, Pipe Fitting, Centrifuges, ANDF, Electrical Panels ,Instruments  etc.
 
19.   M/s Manoj Consulting Engineers Fab. & Erectors New Delhi Approval of Civil Design and Drawing, Stage Inspection of Civil work and Certification as per Rule-33.
20.   M/s Sathe Engineering Co. (P) Ltd. New Delhi Stage Inspection and Certification of Liquid Chlorine Tanks as per CCOE Rules.
21.   M/s. Welkin Engg. Ankleshwar
Stage Inspection and Certification of Isobutylene Tank as per CCOE Rules.
 
22. M/s. Lanxess ABS Ltd. Moxi, Nandesari, Vadodara
Stage wise inspection or Final Inspection  of  Reactors,  Pressure Vessels, Heat Exchangers, Columns and final inspection of various bought out items like Glass lined Reactors,  Pumps, Valves, Pipes, Pipe Fitting, Centrifuges, ANDF, Electrical Panels ,Instruments   etc., site fabrication of tanks.
 
23. M/s Khanna & Khanna -----
Stage Inspection and Certification of  Ethylene Oxide Storage  Tank as per CCOE Rules.
 
24. M/s VSM projects (P) Ltd. Jahangirpura ,Malegaon
Stage Inspection of Civil work and Certification as per SMPV (U) for Rule-33.
 
25. M/s Bayer Crop science Ankleshwar
Stage wise inspection or Final Inspection of R Reactors, Pressure Vessels, Heat Exchanges, Columns, Tanks.
 
26. M/s Jubliant Organosys Ltd. Bhartiagram( J. P. Nagar) , Savli (Vadodara) Stage wise inspection of Reactors and Agitator
27. M/s Soumya Transports Pvt. Ltd. -----
Stage wise inspection and Certification of Mobile E.O. Tankers  as per CCOE Rules.
 
28. Gulbrandsen Chemicals Pvt. Ltd. Mujpur
Checking and Approval of Design and Drawings. and Third Party Inspection Services  at vendor's shop for high pressure Autoclaves.
 
29. Jayant Agro Organics  Ltd. Baroda
Checking and Approval of Design and Drawings. Stage wise Inspection of Autoclave at  vendor's  shop.
 
30. RBG Ltd. -----
Stage Inspection of  RO  Pressure Vessels at PENTAIR  ,Goa., Stage wise inspection of Shell and Tube Heat Exchangers at Tema India Ltd. at Acchad and Silvassa.
 
31. Ciba India  Ltd. Taiwan , Goa, Mumbai
Final Inspection of Glass   Lined Reactor ,stage wise inspection of Acetone Recovery unit.
 
32. Allied Engineers and Fabricators Rajastan , Mumbai
Inspection and Certification of  Breathing Air Tanks , Air Receivers  as per SMPV  (U)  Rules.
 
33. NDT Services Baroda , Jamnagar
Inspection and Certification as per Rule 19 & 18 of SMPV.
 
34. Unimark Remedies Ltd. Vapi, Bavla
Stage wise inspection or Final Inspection  of  Reactors, Pressure Vessels, Heat Exchangers, Columns and final inspection of various bought out items like Glass lined Reactors,  Pumps, Valves, Pipes, Pipe Fitting, Centrifuges, ANDF, Electrical Panels ,Instruments   etc.
 
35. Sabero Organics Gujarat Ltd. Mumbai
Final inspection of Reactor, Autoclaves, condenser, Collection tanks.
 
36.   Deepak Fertilisers &  Petrochemicals corp. Ltd. Taloja
Final inspection of  Reactor, Autoclaves, condenser , Collection tanks, cooling tower and bought out  items like valves, pipe, pipe fittings.
 
37.   Durable Gas Pvt. Ltd. Malegaon
Inspection of Civil work and Certification as per Rule-33. for Auto LPG Installation at dispensing station.
 
38.   Ganesh Benzoplast Ltd. JNPT Nhavaseva
Inspection and certification of  8" pipe line at 10 KG Pressure.
 
39. Lanxess India Pvt. Ltd. Thane
Inspection and certification of vessels under SMPV U) Rules. ( Inspection includes Hydro test ,Thickness test  & visual inspection etc. ) of Pressure vessels.
 
40.   Nipur Chemicals Ltd. Tarapur
Stage wise Inspection of Autoclave.
 
41. S. D. fine Chem Ltd. Tarapur
Stage wise inspection or Final Inspection  of  Reactors, Pressure Vessels, Heat Exchangers, Columns and site inspection at Tarapur site.
 
42.   Pacifica Developers Pvt. Ltd. VP project, Green Acres site, La Habitat Site
Inspection of lifts as per below mentioned scope-      
1) Checking all components in terms of specifications and performance.
2) Preparation and submission of reports for the same.

 
43. Novodigm Ltd. Dabhasa, Vadodara
Stage wise inspection or Final Inspection  of  Reactors, Pressure Vessels, Heat Exchangers, Columns and final inspection of various bought out items like Glass lined Reactors,  Pumps, Valves, Pipes, Pipe Fitting, Centrifuges, ANDF, Electrical Panels ,Instruments   etc.
 
44. GISCO ( Global Inspection Services Co., Ltd.). Various projects in India and Abroad
Final inspection of Gas Heat Exchanger at Godrej,Mumbai , Inpsection of Nitrogen System at Inox, Baroda , Gas train at Thermax, pune etc.
 
45. Reliance Industries Limited Hazira
Preparation of  pressure thickness calculation of  sphere for propane storage as per ASME sec. VIII div. 2 1992 and 2007 which include total  checking sphere i.e. Nozzel, pad plate supports etc.
 
46. Sidharth Trading & Exports Pvt. Ltd. Mumbai
Final inspection of Valves.
 
47. Visen Industries Ltd. Jammu, Silvasa, Sharjaha, Tarapur
Stage wise inspection or Final Inspection  of  Reactors, Pressure Vessels, Heat Exchangers, Columns and final inspection of various bought out items like Glass lined Reactors,  Pumps, Valves, Pipes, Pipe Fitting, Centrifuges, ANDF, Electrical Panels ,Instruments   etc.
 
48.   Hi-Shine Inks Pvt. Ltd. Bilimora
Stage wise inspection of Reactors.
 

49.

USV  Ltd. Chiplun  (Maharashtra)
Stage wise inspection or Final Inspection  of  Reactors, Pressure Vessels, Heat Exchanges, Columns and final inspection of various bought out items like Glass lined Reactors,  Pumps, Valves, Pipes, Pipe Fitting, Centrifuges etc.
 
50.   Stonewood Cem-fab (I)Pvt. Ltd. Taloja
Stage wise inspection or Final Inspection  of  Reactors, Pressure Vessels, Heat Exchangers, Columns and final inspection of various bought out items like Glass lined Reactors,  Pumps, Valves, Pipes, Pipe Fitting, Centrifuges
 
51.   Surya Pharmaceuticals Ltd. Jammu
Expediting / Stage wise and final inspection of  Reactor, Pressure Vessels, Distillation Columns, Heat exchangers ,storage tanks etc.
 
52. BASF Chemicals ( I) Pvt Ltd. Manglore
Expediting / Stage wise and final inspection of  Reactor, Pressure Vessels, Distillation Columns, Heat exchangers etc.  as per approved QAP.
 
53.   Standard Surfactants Ltd. Mandideep
Final inspection of Tank and Vessels at Doshi Engineers.
 
54. Tata  Steel  Ltd  (Wire Division) Jamshedpur, Tarapur
Final inspection/ Expediting / Spot inspection  of FRVE Tanks, Fabricated equipments and  various bought out items like Glass lined Reactors,   Pipes, Pipe Fitting, Centrifuges Cranes , Panels, UPS etc.
 
55. SKM consult ----
Inspection of various types of Valves like Check Valves, Globe Valves, Gate Valve, Motorized Valves etc. as per ARAMCO approved QAP and Procedures.
 
56.   Johnson Diversey (I) Pvt. Ltd. Jammu
Stage wise inspection of Pressure Vessels, Mixer,  Storage Tank, Holding Tank at  Vendors & at Fabrication Site.
 
57.   Merchem Ltd. Panoli , Ankleshwar
Stage wise inspection and certification of  Reflux condensers & Reflux Receivers.
 
58. Relax Technofab ----
Approval of Mechanical & Civil Designs, Stage wise inspection & certification of pressure vessels, stage wise inspection of civil works at site, Certification of Tank installation as per SMPV (U) Rules.
 
59.   Fuchs Lubricants (I) Pvt. Ltd. Ambernath
Stage wise inspection or Final Inspection  of  Reactors, Pressure Vessels, Heat Exchangers, Columns and final inspection of various bought out items like Glass lined Reactors,  Pumps, Valves, Pipes, Pipe Fitting, Centrifuges etc.
 
60. Teva API India  Ltd. Israel, Gajaraula , Malanpur
Stage wise inspection or Final Inspection of  Reactors, Pressure Vessels, Heat Exchangers, Columns and final inspection as and when intimated by client.
 
61. Mahashtra Tourism development Corporation Ltd. Andheri, Mumbai and Akluj, Solapur
Final inspection  and certification of Musical Fountains at Andheri, Mumbai and Akluj, Solapur.
 
62. Apave International Inspection ----
Final Inspection of Air Blower at Usha Compressor. Final Inspection of PSVPlate PacksWalnut Filter Pump, Back Wash Pump FLP MCC panel.
 
63. Ideal Quality Engineer (I) Pvt. Ltd. Hyderabad
Stage wise or Final Inspection of Reactors, Pressure Vessels, Heat Exchangers, Columns and final inspection of various bought out items like Glass lined Reactors,  Pumps, Valves, Pipes, Pipe Fitting, Centrifuges etc.
 
64. M/s Tuv Rheinland ( India ) Pvt. Ltd. Mumbai
Visual, dimensional, packing and loading witness for structural items at  Tiger Steel, Murbad.
 
65. Graphite  India  Ltd. Nashik
Stage wise inspection of Autoclave as per approved Design, Drawing & QAP at Rotary  Equipments.
 
66. Canara Tour & Travels  Pvt. Limited. Mumbai
Engineering consultancy, Procurement assistance and inspection & Certification as per CCOE rule of . 3 Nos. of 19.29 M3 WC Mobile E.O. Tankers.
 
67. Navin Fluorine International Ltd. Devas, Surat
Stage wise inspection of Inconel Reactors at Special metal Industries &  Technofab , Stage wise inspection and final inspection  of  Reactors, Pressure Vessels, Heat Exchangers, Columns and bought out items.
 
68.   Kansai Nerolac Paints Ltd. Mumbai
Stage wise inspection as per approved QAP for 29 nos. of 6 KL mixtures.
 
69.   Supreme Petrochem  Ltd. Mumbai
Stage wise Inspection as per Approved Drg. & QAP for Reactors.
 
70.   SRF Ltd. Dahej
Stage wise and final Inspection as per Approved Drg & QAP of Reactors, Storage Tanks, and Vessels.
 

Multiple orders from same client

PIPELINE PROJECTS


Sr.No.
 
 
Client Name
 

Work Details
 

Services Provided
 
1.  ♦  Broadview Engineering Ltd., Nigeria
Third party inspection and Certification of 3LPE Coated line Pipes for N-LNG, Phase-3, Gas Supply Project of Nigerian Agip Oil Company, Lagos.
 
Expediting, Up to date status reporting, Inspection, Monitoring, Surveillance during production of Line pipes in Pipe mill ( M/s- SAW Pipes Ltd, India ) on a full time basis as per production shift in the mill.
2. Velosi America LLC USA SCARAB / SAFFRON DEVELOPMENT Project of M/s - Brullus Gas Company, Egypt.
Expediting, Up to date status reporting, Inspection Monitoring, Surveillance during production of API 5L Line pipes in Pipe mill ( M/s- SAW Pipes Ltd, India ) on a full time basis as per production shift in the mill.
 
3. Mediterranean Oil Services GmbH., Germany. Seamless Drill Pipes with end tools meant for export to SIRTE  OIL COMPANY - LIBYA.
Expediting, Up to date status reporting, On line Inspection, Monitoring, Surveillance during production of API 5L, Line pipes in Pipe mill ( M/s- SAW Pipes Ltd, India) & ( M/s- WELSPUN  Gujarat Stahl Rohren Ltd. India)  on a full time basis as per production shift in the mill.  Total Qty. approx. 50 Kms.

Pre Shipment and Loading inspection during storing, Road transport, Ship loading, Stowage, Stability checking and certifying for shipment.
 
4. Intertek - Mumbai ( For CLOUGH - Australia) ONGC ( Mukta Panna Gas Field)
On Line Pipe Mill inspection of API 5L Line Pipes at WELSPUN _India. Anode Inspection at PSL - Kandla, Loading Inspection for transportation from WELSPUN to PSI Holdings (for Coating).

Coating inspection on API 5 L Line pipes for Epoxy,  Concrete(CWC), 3 LPP (3 layer Poly propylene), PCC (Poly Chloroprene)  at PSL - Kandla & Vizag.  Anode inspection and installation of Line Pipes.
 
5.   Braceco - Ghana BOST - Harbor  Terminal - Ghana (Tema -Akosombo Pipeline Project)
Witnessing of INTELLIGENT PIGGING (MFL) tests for on line condition monitoring of underground pipe lines (Oil Batch Line Piping over 100 kms). Certification of above test results. Recommendation of any repair work and its procedure.
 
6. Zakhem Construction Nigeria Ltd. Third party inspection and Certification of API 5L, 3LPE Coated line Pipes for NIGERIAN GAS COMPANY
Expediting, Up to date status reporting, Inspection, Monitoring, Surveillance during production of 24 inch dia. x 5 km long and   36 inch dia. x 196.5 km long line pipes in Pipe mill ( M/s- SAW Pipes Ltd, India ) on a full time basis as per production shift in the mill.
 
7. Zakhem Construction Nigeria Ltd. Third party inspection and Certification of API 5L, 3LPE Coated line Pipes for NIGERIAN GAS COMPANY
Inspection, Expediting, Monitoring, Surveillance during production of 24 inch dia. X 30 km  long line pipes in Pipe mill
( M/s- PCK - CHINA ) on a full time basis as per production shift in the mill.
 
8. PSC Europe - Italy Inspection of   Drill Pipes, Joints, Drill collers etc. as per API 5D / API 7 for SAIPEM Project
Inspection and Expediting of Tool Joints and Drill pipes in M/s Shanxi Fenglei Machinery - CHINA
 
9.   NWD - Libya Inspection of Drill Pipes as per API 5D / API 7
Inspection of Drill pipes and Tool Joints in  OCTL - India
 
10. Mediterranean Oil Services GmbH., Germany. Inspection of Drill Pipes as per API 5D / API 7 Inspection of Drill pipes and Tool Joints in  OCTL - India

PETROCHEMICAL, OIL & GAS, CHEMICAL AND ASSOCIATED PROJECTS

Sr.No.   Client Name Work Details
Services Provided
 
1.   Brown & Root International Inc., Singapore. Represented VELOSI America LLC., for inspection of equipments in India for M/s - Shell Philippines ( Malampaya Platform Development Project )
Surveillance Inspection, Monitoring, Expediting, Documents checking and Release of Equipments at M/s - Jord Engineers, Baroda, India. & M/s - Larsen & Toubro Ltd., Powai, India.
 
2.  ♦  Baerlocher Germany. Third party inspection for project
Inspection of Reactors and other process equipments, Material handling system with conveyors, bucket elevators, rotary valves, blowers etc., Electrical panels, VFD, Instruments, Site inspection during erection, Piping, Testing and commissioning etc.
 
3.  

NKK ,  Japan / CHAPMAN
( USA )

Ethane - Propane Recovery Project of ONGC (Oil & Natural Gas Commission) - Uran, Maharashtra India.
Provided Inspection Engineers to look after site inspection, Co-ordination, Expediting and reporting on Welding, Piping, erection of static and rotary equipments, testing, and commissioning. Service provided on behalf of NKK & Chapman to ONGC / EIL.
 
4. Colombo Dockyard, Sri Lanka Ship construction and Maintenance & Pipe Line.
Recruitment assistance and approval of specialized welders & fabricators for Ship maintenance & Pipe line construction.
 
5.   Syrian Defense. Syria Inspection of Accessories for MIG Air Craft.
FAT and Pre shipment Inspection of  Ni-Cd Batteries for MIG Air craft and Battery recharging plant consisting of Glass lined Reactors,  RO plant, Water treatment plant, Cooling towers, Pipe and Pie fittings, Valves, Electrical panels, Laboratory equipments & instruments, Chemicals etc.
 
6.   Toyo Engineering Korea Limited., Global Inspection Services Co., Korea Pipe Lines & Export Terminal for SHAKALIN Project  A-166767
Surveillance Inspection, Expediting and Up to date status reporting of  Oil /Water Separator Packages at their Sub vendor M/s-Grand Prix, Faridabad, India.
 
7.   IFFCO (MALAYSIA) SDN. BHD. Malaysia. Malaysia Plant
Third Party Inspection and certification of Heat Exchangers & Glycerin Condenser (Corrugated Heat Exchangers)
 
8. International Steel Services Inc., USA Ion Oxide and Acid Recovery Project for NMDC ,India.
Third Party inspection and Expediting of Various Equipments & Components consisting of FRP equipments, FRP Pipe and Pipe fittings, Pumps, Valves, Instruments, Electrical equipments etc.
 
9.   Lupin Chemicals (Thailand) Ltd. Thailand. Specialty Chemicals / Pharma Plant
Stage wise and final inspection all plant equipments including Reactors, Heat Exchangers, Centrifuges, Electrical panels, Valves, Instruments, Pipe and Pipe fittings etc.
 
10.   Petrofac International., Sharjah. IOCL  ( Indian Oil Company Ltd ) & CRL ( Cochin Refineries Ltd.) DHDS project
Expediting and Inspection of various fabricated equipments like columns , Pressure vessels etc. and bought out items like Pumps Valves etc.
 
11. Samsung / A&A Engineering Korea. IOCL Lab Project in India.
Inspection & expediting of Various fabricated equipments (118 nos.)  on behalf of LSTK Contractor M/s- Samsung Engineering, Korea. Equipments include Reactors, Columns, Heat Exchangers, Air coolers, Pressure Vessels, Internals etc.
Inspection of Electrical Panels, PLC, Transformers, Cables, Light fittings, Fire Alarm system, Battery Chargers, Valves, Pipes, Fittings, Instruments, Cable trays etc.
 
12.   KSRC / HEISCO Kuwait Kuwait National Petroleum Company., Shuaiba Refinery.
Third party Inspection of Valves and Inspection of  replacement items for Boilers.
 
13. Schenectady International New York Due Diligence of  Specialty Chemical plant in India.
Inspection and certification of plant equipment, piping etc. Valuation of Entire plant.
 
14.   Thai Cellulose Thailand Thailand Plant
Stage wise inspection of Nauta Mixers in India and  Site inspection during civil construction, Mechanical erection, Piping, Testing and commissioning at Thailand.
 
15. PSC Europe srl. Italy. Water Treatment Package for OKPAI Power Plant, Nigeria.

ABB Solutions Italy / NAOC

Final Inspection of Various Equipments, Piping and accessories at sub vendor M/s- Ion Exchange India Ltd on behalf of SPI/NAOC.
Pre shipment  inspection of AAAC ASTER & AACSR PHLOX CONDUCTORS at APAR Ind. - India.
 
16.   TOKAI / REB Bangladesh Rural Electrification Board, Bangladesh Pre shipment inspection / FAT of bulk quantity Surge Arrestors, Distribution Transformers and Line Hardware at various vendors in India on behalf of V.L.Shafer , America.
17. VISEN INDUSTRIES LTD - UAE PVA Plant in Sri Lanka & Sharjah (UAE) Stage wise inspection of Reactors  &  Heat Exchangers
18. GENESIS SPECIALTY CHEMICALS LTD. - UK Specialty Chemical Plant in UK
Mechanical and Electrical Plant Components inspection.
 
19. INTERTEK - MUMBAI DESMET - Russain projects, Foster Wheeler - UK, Clough - Australia,
Process Equipments, Boilers, Pumps, Blowers, API 5 L Line pipes, Valves etc.
 
20.   C. SARAFIDIS BROS S.A, GREECE GREECE
Pre Shipment Inspection of Commodities.
 
21. SAPEX - ITALY Sae Power Lines , Ahafo Power Project-Ghana
Inspection of ACSR Conductor and Galvanised steel wire at APAR Ind.
Inspection of Post Insulators at WS Industries, Chennai.
 
22.   Ciba Speciality Chemicals (Taiwan) Ltd. Acetone Recovery Unit
Stagewise & final inspection of unit.
 
23. PRO QC International  North America Inc. Quantum plasma Speakers, Micro faser Quilt
Final and Pre shipment inspection of  various items like Quantum Plasma Speakers, bedsheets, skillits.
 
24.   SKM , Saudi Arabia Manual & Control Valves for Kuwait National   petroleum Corporation.
Final inspection of valves like Globe valves, Check valves, butterfly valves ,Gate valves.
 
25.   DUTCO Tennent - Abudhabi Inspection of Fully Automatic Water Softners
Inspection & FAT of Fully Automatic water Softners at ION Exchange India - Goa.
 
26.   PT Rekeyasa - Indonesia Inspection and Expediting of Various equipments in India for Bio - Ethanol Plant for Gasohol Project of MEDCO - Indonesia.
Expediting, Inspection & FAT of various items like Decanters, Columns, Pumps, Fabricated equipments etc. at vendors like PRAJ, Alfa Laval & KSB in Pune - India.
 
27.   Petroman Petroleum Consultant LLC - Abudhabi Inspection of Wafer Butterfly - Cryo Valves for Techint Engineers Construction for PJ Valves Project
Expediting and  Inspection of various sizes (6" to 18") Wafer type Butterfly valves for Cryogenic service at ADVANCE Valves - Noida, India.
 
28. RBG Ltd, Scotland Inspection of RO Pressure vessels for VSA, project - O2 PEARL, SHELL - QATAR
Pre-shipment inspection & FAT of RO Pressure vessels as per approved ITP by Client at Pentair , Goa along with ASME Authorized inspector.
 
29.   Material Consulting Services, Texas Inspection of Cement Manifold and Sand Manifold for SBM Offshore - France meant for Oil Field Drilling system
Expediting , Inspection and FAT of High Pressure Valve manifold system at WOM, Pune, India. Subsidary of Worldwide Oilfield Machine - USA
 
30.   ECA  SAU International Inspection of Scrapper Recliamer
Inspection and expediting service for  SCRAPPER RECLIAMER at M/s HEW , Reva , M.P.
 
31.   National Chlorine Industries Co. , Jordon Inspection of PP / FRP Tanks
Stage wise inspection and expediting service  as per approved QAP for  PP/FRP Tanks.
 
32. RBG Ltd (For Syntroleum Corporation /  Dynamic Fuels LLC ) Inspection service for Heat Exchangers at TEMA in India Stage wise inspection of Shell and Tube Heat Exchanges as per approved QAP.
33. Fata Hunter India Pvt. Ltd. (Italy) Pinch Roll, Edge miller , Flying Shear, caster drive , Roll Spray  System etc.
Stage wise Inspection and expediting work on various structural / mechanical / other items for steel mills
 
34.   M/s Heft Engineers UAE
Third Party Inspection as per Approved QAP for Air Cooled Heat Exchanger.
 

35.
 
  Velosi PSC-Italy Inspection of Ball Valves Final Inspection & Expediting of C.S & S.S valves at  M/s Virgo, Pune India.

36.
 
  RBG Ltd. Inspection Services for Tubes at M/s Ratnamani, Bhuj in India. Final Inspection of Tubes as per approved QAP at M/s Ratnamani.